|
 |
- All incoming material lots are inspected according to MIL-STD-105E Level II Single Normal Sampling Plan.
- All items are checked according to Engineering Specifications.
- A “Vendor Quality Performance Rating” report is issued periodically.
|
 |
Quality Control |
|
 |
- Inspect all assembling and final products 100% in the production process. The satisfactory units will send to QA (Quality Audit) for final sampling check.
- Alert System is set up to monitor all procedure check points’ failure rate. If any check points’ failure rate exceeded the control limit, production is to be requested to take immediate corrective actions. If result of the corrective action is not observable or unsatisfactory, QC has the authority to stop production immediately.
- Hourly and daily Inspection Report is issued to generate Quality Statistic.
|
|
 |
Quality Audit |
|
 |
- Random check on batches that had already been passed. Perform checking as pre-shipment audit according to customers’ requirement and standard.
|
|
| |